CXT/20P-I monitoring system applies to various level-jib tower cranes. It provides the operator with actual and correct information on working states of tower crane. If the load reaches the rated load or 90% of the specified moment, it will give an early warning. If it reaches 105%, it will alarm and prevent the trolley automatically from moving outward and the hook from lifting upward.